Demarc Extension Survey Checklist

DMARC Extension Survey Checklist


  • Location of the Demarc _______________________


    • Mark on a floorplan if possible

  • Circuit ID____________________________________________

  • Distance to customer’s rack____________________


    • Mark on a floorplan if possible

  • Will copper be used?


    • What type of Copper

    • Distance ______________________m/ft

    • Any special connectors needed? What kind_______________________________

  • Will fiber be used?


    • What kind of fiber__________________________

    • How many strands______________________

    • What kind of ends are to be used______________________

    • Distance ______________________ m/ft

    • Is a media converter needed?_______________________

    • Is a SFP needed on the customer end of equipment____________________

  • Will penetrations be required?


    • How many_____________

    • Material type _________________

    • How long to complete___________

    • Firestop Needed? ______________

    • Permits Needed________________

  • Cable management


    • Conduit? ______________m/ft

    • Panduit? ______________m/ft

    • Fiber tray needed? _____________

    • Velcro? ____________rolls

    • Hangers?__________ quantity

  • Required Pictures


    • Smart jack for circuit

    • Existing connections on both sides

    • Current cable labeling